Site Surveys for Offshore Aquaculture: Finding Water That Will Actually Grow Fish

Most of the surveys covered in this series exist to find a hazard or characterise a seabed before something gets built on it. An offshore aquaculture site survey is asking a different kind of question: not "is this location safe to build on," but "will fish, shellfish, or seaweed actually thrive here, for years, without wrecking the water quality around them." That distinction changes which instruments matter and how the resulting data gets used — by the farm operator, and increasingly, by the regulator deciding whether to grant a permit at all.

Depth and Current Are Not Independent Numbers

Site-selection guidance for open-ocean aquaculture gives ranges rather than fixed rules, because the right depth depends on the current running through it, and vice versa. Small-scale producers can work in 5 to 20 metres of water; typical operational guidance widens that to 10 to 30 metres; and for larger cage systems, anchoring becomes the limiting factor — one widely cited minimum for secure mooring of larger cages is around 36.5 metres, while depths beyond about 50 metres sharply raise mooring cost and complexity. Current speed has its own working range, roughly 0.2 to 1.5 knots: too slow, and waste and uneaten feed accumulate under the cage instead of dispersing; too fast, and the fish expend excess energy holding position, while the mooring system faces higher loads. A survey that measures depth without current, or current without depth, only answers half the siting question.

An aquaculture net pen floating in open ocean water off the coast of Maine
An open-water aquaculture pen off the coast of Maine. Positioning a structure like this starts with a site survey establishing depth, current, and seabed conditions well before any net or mooring line goes in the water. Source: NOAA National Ocean Service, Wikimedia Commons (Public Domain).

What a Baseline Environmental Survey Actually Contains

In U.S. federal permitting practice, this work is formalised as a Baseline Environmental Survey (BES) — required before an operator can even apply for the discharge and habitat permits a farm needs. A BES is not a single instrument but a bundle: a seafloor survey using side-scan sonar, sub-bottom profiling, and magnetometry to characterise the seabed and rule out obstructions or archaeological sensitivity; hydrographic and oceanographic measurements covering current speed and direction through the water column; and water-quality and sediment sampling establishing a pre-farm baseline that later monitoring gets compared against. That last point matters as much as the physical siting data: regulators typically require an applicant to keep sampling water quality, sediment, and benthic conditions at both a background location and near the cage, at a frequency tied to how much fish biomass is in the water — meaning the "survey" doesn't end when the permit is issued, it continues for the life of the farm.

Two researchers deploying an ADCP instrument frame from the deck of a survey vessel
Deploying an Acoustic Doppler Current Profiler (ADCP) — the instrument that supplies the current-speed and current-direction data a site survey needs to confirm a location sits inside the workable current window. Source: J.R. Lacy, USGS Pacific Coastal and Marine Science Center, Wikimedia Commons (Public Domain).
Key Point: A BES doesn't just describe a site — it becomes the legal baseline a farm is held against for its entire operating life. Getting the pre-construction current, sediment, and water-quality numbers right isn't a formality; it's the reference point every future compliance inspection will be measured from.

Case Study: A Small Demonstration and an Eight-Year Permit

Two projects run by the same Hawaii-based company, roughly a decade apart, show how far the surveying and permitting burden has grown. Between 2011 and 2014, Ocean Era (then Kampachi Farms) ran the Velella Beta and Velella Gamma demonstration projects off the Kona coast of Hawaii — small net-pen arrays close to shore that, as a side effect, acted as fish-aggregating devices popular with the local fishing community, and were named one of TIME Magazine's Best Inventions of 2012. The company's next major project, Velella Epsilon, is a single net pen roughly 40 miles offshore in the Gulf of Mexico intended to culture about 20,000 red drum over a year — a modest production scale on paper, but one that required a Baseline Environmental Survey covering side-scan sonar, sub-bottom profiling, magnetometry, and hydrographic measurement, followed by an Environmental Assessment, an Essential Fish Habitat Assessment, and an Ocean Discharge Criteria Evaluation before the EPA issued a final NPDES discharge permit with a Finding of No Significant Impact in September 2020. Even then, the remaining permits needed to actually begin construction were not finalised until 2026 — an eight-year process from first proposal to clearance, for what will be the first open-ocean finfish aquaculture project permitted in U.S. federal waters.

Screening for Sites Before Anyone Applies for a Permit

Partly in response to permitting timelines like that one, NOAA has started doing large-scale site screening in advance, before any individual operator files an application. Its Aquaculture Opportunity Area (AOA) programme ran a GIS-based suitability analysis across more than 200 spatial data layers — covering everything from bathymetry and currents to shipping lanes, fishing grounds, and protected areas — to pre-identify areas likely to be environmentally, socially, and economically workable for aquaculture. That analysis has so far proposed nine areas in the Gulf of Mexico and ten in the Southern California Bight, each between 500 and 2,000 acres, intended to give a future applicant a head start on the site-suitability question a full BES would otherwise have to answer from zero.

Colorful multibeam bathymetry map showing detailed seafloor depth variations
Multibeam bathymetry of the kind used to establish site depth and seabed character during aquaculture site screening — the same core dataset used across hydrographic surveying, applied here to a siting rather than a navigational or hazard question. Source: Peter Dartnell, USGS Pacific Coastal and Marine Science Center (Public Domain).

The Framework Behind the Numbers

Internationally, the FAO frames this same siting problem around ecological carrying capacity under its Ecosystem Approach to Aquaculture — the idea that a site survey should establish not just whether a location can physically hold a farm, but how much production the surrounding water body can absorb without degrading. That framing is why a modern offshore aquaculture site survey increasingly looks less like a one-off site characterisation and more like the opening chapter of a monitoring programme that runs for as long as the farm operates — bathymetry and current data decide where the cages go, and the same instruments, repeated on a schedule, decide whether the site keeps working afterward.


References

  1. Frontiers in Aquaculture — Site Selection for Aquaculture of Extractive Species in Open Ocean Environments: A Systematic Review
  2. Marine Technology Society Journal — Site Selection Criteria for Open Ocean Aquaculture
  3. U.S. EPA — Ocean Era, Inc. — Velella Epsilon Aquatic Animal Production Facility NPDES Permit
  4. SeafoodSource — US Army Corps of Engineers Will Hear Public Comment on Velella Epsilon
  5. Perishable News — After 8 Years, Final Permit Issued for Gulf Offshore Aquaculture Demonstration Project
  6. NOAA Fisheries — Aquaculture Opportunity Areas
  7. NOAA — NOAA Analyses to Inform Aquaculture Siting in Gulf of Mexico and Southern California
  8. FAO — Chapter 1: Considerations in the Selection of Sites for Aquaculture

Related Articles

Acoustic Doppler Current Profiler
ADCP

Acoustic Doppler Current Profiler: Measuring Currents Instead of Depth

November 19, 2025 · 8 min read

Benthic Habitat Mapping
Benthic Habitat Mapping

Benthic Habitat Mapping: Turning Backscatter and Ground-Truth Into a Seafloor Ecosystem Map

July 29, 2025 · 8 min read

Environmental Baseline Survey
Environmental Baseline Survey

Environmental Baseline Survey: The Other Data Set Every Offshore Project Needs

October 18, 2023 · 8 min read

Ready to Start Your Project?

Talk to Sonarfix's expert team about your survey and data processing needs. We're ready to deliver the right solution.